Leon Paul Fencing Centre

The Project is based in North West London at the Leon Paul Fencing Centre, 20 minutes from Central London.

The state-of-the-art Leon Paul Centre was built in 2013, and uses many technologies developed for the London 2012 Olympic Games. A total of 24 metallic pistes sit in a 731 sq meter field of play with separate bag/kit storage.

Gym

The Centre also boasts a full equipped performance gym which all Project athletes have scheduled use of as part of the programme.

Breakout Area

Project athletes have their own separate breakout area to use as a workspace for homework or quiet relaxation before and after training sessions.

Physio Room

A separate physio room is located next to the Project offices away from the upstairs fencing area.